modern prefab homes low cost portable house
The prefab houses is a light steel skeleton sandwich panels for the building envelope materials, standard modulus series combination of space, components bolt connection, a new concept of environmental protection and economic homes. Can assemble and disassemble quickly and easily to achieve the universal standardization of the temporary building, establish a green energy efficient building concepts, so that the temporary housing into a series development, integration of production, the matching of supply, inventory and many times working capital used in the field of styling products.
Product Description
Window | Aluminum Alloy Sliding Window |
Door | Steel Security Door |
Wall | 50mm/75mm Sandwich Panel |
Roof | EPS Sandwich Tile |
Main material | Steel Structure(HDG) Sandwich Panels |
Structure | Galvanized Steel Frame |
Our Services
We adhere to the “Customer first, integrity-based” principle, determined to make the enterprise of “the first- class management, first- class benefits, first-class service” of the modern enterprise.
1.Any inquiry will be answered within 24 hours.
2.Professional manufacturer, welcome to visit our website.
3.OEM/ODM.
1) print custom logo on the roof.
4.High quality, fashionable design, reasonable and competitive price, fast delivery time.
5.After-sales service
1) all products will be strict quality inspection before packaging.
2) all products will be packed before shipping.
(1)Lifetime: more than 20 years
(2)High seismic performance: maximum protection 7 scales
(3)Wind-proof: maximum protection 10 scales
(4)Fire resistance: all the materials used will be fire resistance.
(5)Snow resistance: maximum 2.9KN/M2 as required
(6)High water and heat insulation: 100 mm in thickness can match more than 1m thickness of brick wall.
(7)High acoustic insulation: 60db of exterior wall 40db of interior wall
(8)Insect prevention: Free from the damages by insects, such as white ants
FAQ
Q. Can you provide customized services?
A. Yes,we can
Q.Can be shipped within a few days after ordering?
A.Delivery period is negotiated according to different products of customers
Q.Are you responsible for the installation?
A.Yes, we can send professional engineers to go abroad for installation.